Garden Update – Part III


So now we are filling the hole back in, we have a bit better update than ‘Wow that’s a big hole init?’ and more of ‘This is what we have done, and its not just digging a hole!’ So we have built the inner wall for the track round, steps to get over the track and on to the path, and connected the circle line to the new section.

P1000162

This shows the steps and the ‘tunnel’ where the 2 tracks lines will go under. It will be decking on top and the brick that is there will be smaller but will box this end in to look like 2 exits.

P1000164

Another view with the 2 points, there will be 2 more Y’s at the far end, to split off on to the track though the heathers.

P1000165

This image shows the wall where the track runs along, we have left a gap between these 2 rocks so we can put a bridge in, like my lovely paint drawing :)

O BTW that stone that hangs over the track will be made small, as it is currently to low, we will just take a bit off the bottom.

P1000166

The other side with the wall awaiting the track.

P1000167

This shows the new sidings that are now straight, I hope to get 3 tracks along there, but that is in the future.

So, for now, that’s it!

  1. No comments yet.
(will not be published)

  1. No trackbacks yet.